What Clients Are Saying...


We took our first look at HipSavers in 2002. Since then they have become a key tool in our Fall Safety Programme. HipSavers really do work for our people and the soft pads ensure high levels of resident compliance. Delivery is always prompt and the staff at HipSaver are always ready to help.

Physiotherapy Team
Calvary Retirement Community
Cessnock NSW

Read more »

The Hip Saver Online Store uses a 128-bit SSL certificate thereby offering the highest level of encryption and security possible. This means you can rest assured that communications between your browser and this site's web servers are private and secure.

 

HipSaver® Quick Change

« Back to HipSaver® Quick Change

Measurement Instructions

Measure around the widest part of the hip (over incontinence product if applicable)


High Compliance

High Compliance   1 pant with hip protecting pads permanently sewn in.
Price:$89.00
  
Version:
Size:
Quantity:
 

High Compliance with Tailbone Protection

High Compliance with Tailbone Protection   1 pant with hip and tailbone protecting pads permanently sewn in.
Price:$99.00
  
Version:
Size:
Quantity:
 

Starter Kit

Starter Kit  

3 pants and 1 set of removable interchangeable hip protecting pads.

Price:$166.00
  
Version:
Size:
Quantity:
 

Veterans Kit

Veterans Kit   4 pants and 2 sets of removable interchangeable hip protecting pads.
Price:$254.00
  
Version:
Size:
Quantity:
 

Protective Pads Only

  1 set of hip protecting pads i.e. 2 pads. (Lifetime warranty)
Price:$49.00
  
Quantity:
 

Pant Only

  1 pant for holding hip protecting pads. (hip protecting pads not included)
Price:$39.00
  
Version:
Size:
Quantity:
 

Back to Top

HipSaver® – the original soft hip protector with proven protection
Ph:1300 767888 Fax:1300 767999 E-mail: info@hipsaver.com.au Web: www.hipsaver.com.au